Final | 5/14/2019 | 5/15/2019 | 5/15/2019 | P | PASS |
Chad Schwendiman
|
|
|
Please contact Dustin at ###-#### before arriving and with any questions you may have. Thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum
|
Rough-in | 5/10/2019 | 5/13/2019 | 5/13/2019 | A | PASS |
Chad Schwendiman
|
|
|
Please call Dustin at least 30 min prior to inspection, thank you. Phone #: ###-#### Inspection requested via web by Rhonda Marcum
|
Final | 5/1/2019 | 5/2/2019 | 5/1/2019 | A | PART |
Chad Schwendiman
|
|
|
call for access- Dustin Phone #: ###-#### - Temporary occupancy of the basement is okay under the conditions of the temporary ventilation plan.
1. All stairwells and openings from the outside into the basement space will be left open during occupied hours. 2. The garage door at ground level will be left open, essentially creating direct window openings to outside via the windows located at the northwest corner of the basement. Said windows will be left opening during occupied hours and a floor mounted fan shall be provided ventilate the space with outside air. The fan shall be mounted as close as possible to the window opening, and the direction of airflow shall be into the basement space. Said fan shall operate during all occupied hours and until the permanent outside air ventilation equipment is installed. 3. The required amount outside air for the basement space is 655 CFM. The contractor shall provide a portable fan with minimum 1/2 HP motor, and minimum airflow of 655 CFM.
|
Rough-in | 4/26/2019 | 4/29/2019 | 4/29/2019 | A | PASS |
Chad Schwendiman
|
|
|
Please call Dustin, Thank you. Phone #: ###-#### Inspection requested via web by Rhonda Marcum - Rough in okay. Contractor asked about the possibilty of getting a temporary occupancy for the basement portion. I advised him they would need to have the ERV installed and functional prior to being able to get the okay for temporary occupancy
|
Rough-in | 4/25/2019 | 4/26/2019 | 4/26/2019 | A | FAIL |
Chad Schwendiman
|
|
|
Please call Dustin, thank you. Phone #: ###-#### Inspection requested via web by Rhonda Marcum - Need to r4emove sheetrock to be able to inspect duct work to fan and eru. Need to seal joint on duct in basement where it goes through exterior wall. Need to connect unit heater vent to b-vent. Need installation instructions for eru's
|