Final | 9/25/2019 | 9/26/2019 | 9/26/2019 | A | PASS |
Brian Scoles
|
|
|
please call prior to arriving for access Phone #: ###-#### Inspection requested via web by Nicholas Paige- final ok
|
Final | 9/24/2019 | 9/24/2019 | 9/24/2019 | A | PART |
Brian Scoles
|
|
|
need to secure gas piping to supports on roof- equipment under class 1 hood doesnt meet clearances will need relocated- temp occupancy ok- will look at this on other mech final
|
Pressure Test | 7/30/2019 | 7/31/2019 | 7/31/2019 | A | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige- 60lb gas pass- tagged meter location- need to see low pressure test still
|