Final | 11/4/2019 | 11/6/2019 | 11/6/2019 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Kelton Tackett- final ok-
|
Final | 10/30/2019 | 10/30/2019 | 10/30/2019 | P | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Kelton Tackett- need electrical permit issued for electrical work on boiler- mec permit is attached to building permit from 2012- need to verify bld is right or did it need one- Talked with Kelton onsite he will check into this and let me know- Boiler and gas piping ok- will final out once issues have been resolved
|
Mec-Aging Inspection | 10/29/2019 | 10/29/2019 | 10/29/2019 | | CANC |
Brian Scoles
|
|
|
bld still open- wip
|
Rough-in | 7/30/2019 | 7/31/2019 | 7/31/2019 | A | PASS |
Brian Scoles
|
|
|
Site contact Kelton ###-#### or Andre ###-#### Inspection requested via web by Kelton Tackett- R/I on boiler and fluing ok- hydronic test was done live no leaks seen
|
Pressure Test | 7/30/2019 | 7/31/2019 | 7/31/2019 | A | PASS |
Brian Scoles
|
|
|
Site contact Kelton ###-#### or Andre ###-#### Inspection requested via web by Kelton Tackett- 60lb gas x 2 pass
|
Pressure Test | 7/29/2019 | 7/30/2019 | 7/30/2019 | A | FAIL |
Brian Scoles
|
|
|
Inspection requested via web by Kelton Tackett- called number to RSCI and said it was disconnected or no longer in service- need phone number for contact onsite to access inside of facility or contractor onsite for access
|