Final | 9/6/2019 | 9/6/2019 | 9/6/2019 | P | PASS |
Jack Reynolds
|
|
|
BRIAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER - final ok
|
Rough-in | 5/22/2019 | 5/23/2019 | 5/23/2019 | A | PASS |
Jack Reynolds
|
|
|
SETH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER - gas piping R/I ok
|
Pressure Test | 5/22/2019 | 5/23/2019 | 5/23/2019 | A | PASS |
Jack Reynolds
|
|
|
SETH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER - 60 lb gas pressure test ok - tagged meter location
|