Final | 12/2/2019 | 12/2/2019 | 12/2/2019 | P | PASS |
Jack Reynolds
|
|
|
final Phone #: ###-#### Inspection requested via web by Brandon Sorensen - final ok
|
Rough-in | 11/1/2019 | 11/1/2019 | 11/1/2019 | A | PASS |
Jack Reynolds
|
|
|
R/I ceiling cover ok - still need to gas piping pressure test by others on the roof
|
Rough-in | 10/16/2019 | 10/17/2019 | 10/17/2019 | A | PART |
Jack Reynolds
|
|
|
seal inspection Phone #: ###-#### Inspection requested via web by Brandon Sorensen - R/I duct seal ok for insulation - need to see refrigeration piping supported above ceiling - need to also see a gas pressure test on gas lines
|
Rough-in | 10/14/2019 | 10/15/2019 | 10/15/2019 | A | NR |
Jack Reynolds
|
|
|
seal inspection Phone #: ###-#### Inspection requested via web by Brandon Sorensen - need review of structural approved on new RTU's before R/I inspection
|
Rough-in | 10/10/2019 | 10/10/2019 | 10/10/2019 | P | FAIL |
Jack Reynolds
|
|
|
sealer inspection Phone #: ###-#### Inspection requested via web by Brandon Sorensen - need approved city stamped prints onsite
|
Rough-in | 9/17/2019 | 9/18/2019 | 9/18/2019 | A | FAIL |
Chad Schwendiman
|
|
|
SEALER INSPECTION Phone #: ###-#### Inspection requested via web by Brandon Sorensen - Need to submit mechsanical drawings to the city of boise plan review. Need to submit structrual calculations for new RTU if not already submitted. Need to add HVAC work and valuation to permit. do not proceed until plans are approved and permit is adjusted
|
Rough-in | 4/17/2019 | 4/18/2019 | 4/18/2019 | A | NR |
Jack Reynolds
|
|
|
rough/cover Phone #: ###-#### Inspection requested via web by Brandon Sorensen - Not ready cooler box is set but no refrigerant lines are ran/ condensate lines - talked with the general about what was happening with the HVAC system and he says that it is being designed at the moment. possibly two new RTU's being set instead of just one.
|