Final | 5/16/2019 | 5/17/2019 | 5/17/2019 | A | PASS |
Brian Scoles
|
|
|
meet at 815 am- gas piping final ok
|
Pressure Test | 4/22/2019 | 4/22/2019 | 4/22/2019 | P | PASS |
Brian Scoles
|
|
|
INSTALLER DOUG ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- 60lb gas pass tagged meter location- 20lb gas pass- need union after shutoff valve and sediment traps on both side of regultor- call in final when ready
|
Pressure Test | 4/19/2019 | 4/19/2019 | 4/19/2019 | P | FAIL |
Brian Scoles
|
|
|
please call ahead of time ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- 60lb test failed at 20psi- 20lb gas fail gauge at 10psi
|