Final | 7/12/2019 | 7/15/2019 | 7/15/2019 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Ashley Shoecraft - fireplace final ok
|
Rough-in | 5/2/2019 | 5/3/2019 | 5/3/2019 | A | PASS |
Jack Reynolds
|
|
|
Any questions please call Matt Harrison @ ###-#### Phone #: ###-#### Inspection requested via web by Ashley Shoecraft - fireplace R/I ok
|
Rough-in | 4/29/2019 | 4/30/2019 | 4/30/2019 | A | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Ashley Shoecraft - fireplace width framing needs to be 37" min - fireplace clearance on sides needs to be 1/2"
|