Final | 7/2/2019 | 7/3/2019 | 7/3/2019 | P | PASS |
Jack Reynolds
|
|
|
call tony for final Phone #: ###-#### Inspection requested via web by Brandon Sorensen - final ok signed occ card
|
Rough-in | 6/21/2019 | 6/21/2019 | 6/21/2019 | P | PASS |
Jack Reynolds
|
|
|
cover inspection Phone #: ###-#### Inspection requested via web by Brandon Sorensen - R/I ceiling cover ok
|
Rough-in | 6/20/2019 | 6/20/2019 | 6/20/2019 | P | FAIL |
Jack Reynolds
|
|
|
cover inspection Phone #: ###-#### Inspection requested via web by Brandon - duct smoke detectors ok - ductless split condensate needs to be ran in min 3/4" approved material. Use pump to achieve grade then gravity drain in approved material
|
Rough-in | 6/14/2019 | 6/17/2019 | 6/17/2019 | A | FAIL |
Chad Schwendiman
|
|
|
cover inspection - call tony Phone #: ###-#### Inspection requested via web by Brandon Sorensen - Need duct smoke detectors installed, need condensate installed for mini split
|
Rough-in | 4/30/2019 | 5/1/2019 | 5/1/2019 | A | PASS |
Jack Reynolds
|
|
|
seal inspection Phone #: ###-#### Inspection requested via web by Brandon Sorensen - duct seal ok - need to see 3/4 condensate line ran for ductless split - duct work above bathroom hard lid ok for cover - rtu 1 will have return air transfers ran for offices at trim
|