Final | 5/23/2019 | 5/23/2019 | 5/23/2019 | A | PASS |
Brian Scoles
|
|
|
final ok- card signed
|
Final | 5/16/2019 | 5/17/2019 | 5/17/2019 | A | PART |
Brian Scoles
|
|
|
Balance is done. It is emailed to Brian Scoles Phone #: ###-#### Inspection requested via web by Drew Tverdy- temp occupancy ok- equipment under hood ok
|
Rough-in | 5/15/2019 | 5/16/2019 | 5/16/2019 | A | PASS |
Brian Scoles
|
|
|
Final rough in before final Phone #: ###-#### Inspection requested via web by Drew Tverdy- R/I ok- appilances under hood ok- mau and exhaust fan on roof ok- might need screening per prints on roof equipment- need air balance report at final
|
Rough-in | 5/14/2019 | 5/14/2019 | 5/14/2019 | P | PASS |
Brian Scoles
|
|
|
Light test on 52 inch long grease duct. We will have it ready at 1:00 Phone #: ###-#### Inspection requested via web by Drew Tverdy- light test pass 52" piece with offset to hood- will look at roof on next inspection
|
Rough-in | 5/13/2019 | 5/13/2019 | 5/13/2019 | P | CANC |
Brian Scoles
|
|
|
Light test on grease duct. Will be ready by 2:00 Phone #: ###-#### Inspection requested via web by Drew Tverdy- building permit needs issued to do mech inspection still under review- mech permit needs attached to bld- reschedule when bld issued- talked with Drew about this by phone
|