Final | 10/21/2019 | 10/22/2019 | 10/22/2019 | P | PASS |
Brian Scoles
|
|
|
Early in the P.M. if possible, Thank you !! Phone #: ###-#### Inspection requested via web by Bruce Lacy- final ok
|
Rough-in | 5/27/2019 | 5/28/2019 | 5/28/2019 | A | PASS |
Brian Scoles
|
|
|
Gas pressure test on outside, documents at furnace / laundry room Phone #: ###-#### Inspection requested via web by Bruce Lacy- R/I ok
|
Pressure Test | 5/28/2019 | 5/28/2019 | 5/28/2019 | A | PASS |
Brian Scoles
|
|
|
Bruce Phone #: ###-####- 20lb gas pass
|