Final | 8/19/2019 | 8/20/2019 | 8/20/2019 | P | PASS |
Jack Reynolds
|
|
|
door code 0911 the 2nd ac is not connected and the line set is only stubbed 2 feet into the wall for a future addition when the homeowners have the refinance done and can afford a coil and line set and furnace. Phone #: ###-#### Inspection requested via web by Joseph Profitt - final ok
|
Final | 8/19/2019 | 8/19/2019 | 8/19/2019 | P | FAIL |
Jack Reynolds
|
|
|
door code 0911 / access through alley (easiest) Phone #: ###-#### Inspection requested via web by Joseph Profitt - gas line needs supported in laundry room - water heater flue needs 1" clearances at ceiling and needs supported - a 2nd A/C is installed for existing home to the west need to see a permit pulled.
|
Rough-in | 6/2/2019 | 6/3/2019 | 6/3/2019 | A | PASS |
Jack Reynolds
|
|
|
builder said that the man j was approved with the building plans and is on site with the building plans Phone #: ###-#### Inspection requested via web by Joseph Profitt - R/I ok - equipment not set yet check to man J on final
|
Rough-in | 5/30/2019 | 5/31/2019 | 5/31/2019 | A | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Joseph Profitt - still need approved Man J. onsite - b vent still needs 1" clearances - exhaust fans on east side aren't connected to roof jack
|
Rough-in | 5/24/2019 | 5/24/2019 | 5/24/2019 | P | FAIL |
Jack Reynolds
|
|
|
its open if you go through the alley Phone #: ###-#### Inspection requested via web by Joseph Profitt - water heater b vent need 1" clearances to combustibles - dryer vent needs supported looks like pipe is falling out of the roof jack - need stamped man J onsite - need to see line set R/I - will check equipment at final
|
Pressure Test | 5/24/2019 | 5/24/2019 | 5/24/2019 | P | PASS |
Jack Reynolds
|
|
|
its open if you go through the alley Phone #: ###-#### Inspection requested via web by Joseph Profitt - 20lb gas pressure test ok -5lb flue pressure test ok - tagged meter location
|