Final | 5/31/2019 | 5/31/2019 | 5/31/2019 | A | PASS |
Brian Scoles
|
|
|
Inspection requested via web by Floyd Floyd Peek- 20lb gas pass- unit heater and fluing ok
|
Final | 5/30/2019 | 5/30/2019 | 5/30/2019 | P | FAIL |
Brian Scoles
|
|
|
Inspection requested via web by Floyd Floyd Peek- need insulation shields on both bvent in attic with 1" sheetrock to bvent clearance- electrical flexable conduit laying against bvent in attic
|
Pressure Test | 5/30/2019 | 5/30/2019 | 5/30/2019 | P | FAIL |
Brian Scoles
|
|
|
Inspection requested via web by Floyd Floyd Peek- gauge below 20
|