Final | 8/12/2019 | 8/13/2019 | 8/13/2019 | A | PASS |
Jack Reynolds
|
|
|
Access: 2639 Adam: ###-#### Phone #: ###-#### Inspection requested via web by Frank Marturello - final ok
|
Rough-in | 6/10/2019 | 6/10/2019 | 6/10/2019 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Frank Marturello - R/I ok - 5lb flue pressure test ok
|
Rough-in | 6/6/2019 | 6/7/2019 | 6/7/2019 | A | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Frank Marturello - need stamped Man J. onsite - 5lb flue pressure test fail
|
Pressure Test | 6/6/2019 | 6/7/2019 | 6/7/2019 | A | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Frank Marturello - 5lb flue pressure test fail - 20lb gas pressure test ok - tagged meter location
|