Final | 9/23/2019 | 9/24/2019 | 9/24/2019 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- final ok- card signed
|
Final | 9/20/2019 | 9/23/2019 | 9/23/2019 | P | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- This should have been R/I inspection- 3 smoke dampers clearances ok- ok for angles
|
Rough-in | 9/19/2019 | 9/20/2019 | 9/20/2019 | P | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- registers flex grid ok- ok for ceiling tiles- need to remove sheetrock on 3 fire dampers to check framing clearances and have installation instructions onsite for inspection
|
Rough-in | 6/7/2019 | 6/10/2019 | 6/10/2019 | A | PART |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth- seal on supply, exhaust and outside air ok- ok to insulate duct runs intialed on contractors print in yellow- will call in for runs to grills- waiting on FCUs to be installed
|