Final | 3/6/2020 | 3/9/2020 | 3/9/2020 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Lindsey Stegemann- fireplace final ok
|
Mec-Aging Inspection | 12/23/2019 | 12/23/2019 | 12/23/2019 | | FAIL |
Brian Scoles
|
|
|
contractor needs to schedule final inspection
|
Rough-in | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Ashley Shoecraft- fireplace R/I ok
|
Rough-in | 6/10/2019 | 6/11/2019 | 6/11/2019 | A | NR |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Ashley Shoecraft- need to verify framing is correct and location of fireplace is ok, gas line is 2 feet outside framing- stud has been removed back side if any electrical is ran needs to maintain clearances to fireplace
|