Final | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Rachael Moore- gas piping final ok- will install unit heaters at later date
|
Rough-in | 6/21/2019 | 6/21/2019 | 6/21/2019 | P | PASS |
Brian Scoles
|
|
|
Pressure test/rough in for gas piping. Please call Rachael with any questions. Phone #: ###-#### Inspection requested via web by Rachael Moore- gas piping R/I ok
|
Pressure Test | 6/21/2019 | 6/21/2019 | 6/21/2019 | P | PASS |
Brian Scoles
|
|
|
Pressure test/rough in inspection for pipe run. Call Rachael with any questions. Phone #: ###-#### Inspection requested via web by Rachael Moore- 20lb gas pass whole system tagged meter location-
|