Final | 10/30/2019 | 10/31/2019 | 10/31/2019 | P | PASS |
Ben Livingston
|
|
|
INSTALLER BRANDAN ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt
|
Final | 10/30/2019 | 10/30/2019 | 10/30/2019 | P | FAIL |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Aaron Alandt - water heater bvent doesnt have clearence to floor joist - - condencer needs locking caps -
|
Rough-in | 7/2/2019 | 7/5/2019 | 7/5/2019 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Aaron Alandt 5lb flue rough-in pass
|
Pressure Test | 7/2/2019 | 7/3/2019 | 7/3/2019 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Aaron Alandt - 20lb gas pressure test ok - tagged meter location
|
Rough-in | 7/2/2019 | 7/3/2019 | 7/2/2019 | P | CANC |
Ben Livingston
|
|
|
Phone #: ###-#### >> Inspection requested via web by Aaron Alandt Inspection cancelled from web by: Aaron Alandt
|