Final | 6/26/2019 | 6/27/2019 | 6/27/2019 | A | PASS |
Brian Scoles
|
|
|
Key is under mat, air balance is with the plans Phone #: ###-#### Inspection requested via web by Ray Bolinger- final ok- air balance ok- signed card
|
Conference | 6/26/2019 | 6/26/2019 | 6/26/2019 | A | DONE |
Chad Schwendiman
|
|
|
Went by to look at exhaust fan interlock. interlock is okay
|
Final | 6/25/2019 | 6/25/2019 | 6/25/2019 | P | FAIL |
Brian Scoles
|
|
|
The key is under the mat if no one is there. Ray Phone #: ###-#### Inspection requested via web by Ray Bolinger- need air balance report onsite- exhaust fan needs to be switched when all lights come on not just on over that station
|
Final | 6/24/2019 | 6/25/2019 | 6/25/2019 | A | FAIL |
Chad Schwendiman
|
|
|
The key is under the front door mat if no one is there. The owner of the shops number is ###-#### ( Arial ) Phone #: ###-#### Inspection requested via web by Ray Bolinger - Building permit sitll has not been issued
|
Final | 6/18/2019 | 6/18/2019 | 6/18/2019 | A | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Ray Bolinger- bld permit needs issued and approved stamped drawings onsite for inspection still in review
|