Final | 12/18/2019 | 12/19/2019 | 12/19/2019 | P | PASS |
Chad Schwendiman
|
|
|
Hello Chad...I have been asked by the builder to sch.this mid to late afternoon on Thursday...If possible...Thank you Phone #: ###-#### Inspection requested via web by Bruce Lacy
|
Final | 12/15/2019 | 12/17/2019 | 12/17/2019 | P | FAIL |
Chad Schwendiman
|
|
|
I am waiting for an air balance that should be completed Tuesday early P.M.. Everything is ready...If you could schedule this for late Tuesday it would appreciated Phone #: ###-#### Inspection requested via web by Bruce Lacy - Need range vent installed, dryer vent needs to be extended out of wall
|
Rough-in | 8/13/2019 | 8/13/2019 | 8/13/2019 | P | PASS |
Brian Scoles
|
|
|
Bruce Phone #: ###-####- R/I ok- duct blast test past post construction
|
Rough-in | 8/11/2019 | 8/12/2019 | 8/12/2019 | A | FAIL |
Brian Scoles
|
|
|
Some things were not ready earlier, my mistake, You witnessed the gas pressure and that''s about it. Should be ready to go for rough now !! Phone #: ###-#### Inspection requested via web by Bruce Lacy- 1- need city stamped approved man j onsite to do inspection 2- need 10mil inert tape on gas line thru wall 3- outside air duct has sags in it need to support and install per manufactures installation instructions
correction notice front window
|
Rough-in | 7/24/2019 | 7/24/2019 | 7/24/2019 | P | FAIL |
Brian Scoles
|
|
|
Up-flow system - ducting in attic... Phone #: ###-#### Inspection requested via web by Bruce Lacy- need nail plates on dryer duct at ceiling both sides- exhaust fans need installed and hooked up- need inert tape on gas line penetration at meter location- need approved man j onsite for inspection- need nail plate on lineset at ceiling- left correction notice front window
|
Pressure Test | 7/24/2019 | 7/24/2019 | 7/24/2019 | P | PASS |
Brian Scoles
|
|
|
Up-flow system - ducting in attic... Phone #: ###-#### Inspection requested via web by Bruce Lacy- 20lb gas pass
|