Final | 10/25/2019 | 10/25/2019 | 10/25/2019 | A | PASS |
Brian Scoles
|
|
|
final ok
|
Final | 9/24/2019 | 9/24/2019 | 9/24/2019 | A | PART |
Brian Scoles
|
|
|
equipment under class 1 hood doesnt meet clearances- talked with general onsite- class 1 curb has vents covered- temp occupancy ok- will look at on other mech final
|
Rough-in | 8/9/2019 | 8/9/2019 | 8/9/2019 | A | PASS |
Brian Scoles
|
|
|
look at firewrap- fire wrap ok- ok for ceiling tiles
|
Rough-in | 7/23/2019 | 7/24/2019 | 7/24/2019 | A | PASS |
Brian Scoles
|
|
|
Light test on remaining welds so we can cover with fire wrap. Phone #: ###-#### Inspection requested via web by Drew Tverdy- light test on all grease duct ok- ok for firewrap 1st and 2nd layers
|
Rough-in | 7/23/2019 | 7/23/2019 | 7/23/2019 | P | PART |
Brian Scoles
|
|
|
Partial light test. Wont be ready until 2:00 p.m. Phone #: ###-#### Inspection requested via web by Drew Tverdy- light test on drop and 12 feet of square duct ok- will look at remaining welds next inspection
|
Rough-in | 7/23/2019 | 7/23/2019 | 7/23/2019 | P | CANC |
Brian Scoles
|
|
|
Partial light test on grease duct. Phone #: ###-#### >> Inspection requested via web by Drew Tverdy Inspection cancelled from web by: Drew Tverdy
|