Rough-in | 9/6/2019 | 9/9/2019 | 9/9/2019 | A | CANC |
Jack Reynolds
|
|
|
Please call Kevin at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - should have been a final not a R/I
|
Final | 9/9/2019 | 9/9/2019 | 9/9/2019 | A | PASS |
Jack Reynolds
|
|
|
Please call Kevin at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum - final ok
|
Rough-in | 8/7/2019 | 8/9/2019 | 8/9/2019 | A | PASS |
Jack Reynolds
|
|
|
Please call Kevin at least 30 min prior to inspection. He requested a cover and I believe that is part of a rough in. Phone #: ###-#### Inspection requested via web by Rhonda Marcum - R/I ok ceiling cover ok
|
Rough-in | 8/2/2019 | 8/6/2019 | 8/6/2019 | A | PASS |
Jack Reynolds
|
|
|
Please call Kevin 30 minutes prior to arrival. Kevin: ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Rhonda Marcum - R/I duct seal ok need to see fresh air insulated before ceiling cover
|