Final | 9/11/2019 | 9/11/2019 | 9/11/2019 | P | PASS |
Brian Scoles
|
|
|
2 fire dampers and angles ok- signed card
|
Rough-in | 9/10/2019 | 9/11/2019 | 9/11/2019 | P | PASS |
Brian Scoles
|
|
|
Rough in for Fire Dampers. Jake is your contact. Thank you! Phone #: ###-#### Inspection requested via web by Kim Adams- fire damper angles ok- ok to cover
|
Rough-in | 8/30/2019 | 8/30/2019 | 8/30/2019 | A | PASS |
Chad Schwendiman
|
|
|
Jake is the contact. Phone #: ###-#### Inspection requested via web by stan lillquist
|
Conference | 8/5/2019 | 8/6/2019 | 8/6/2019 | A | DONE |
Brian Scoles
|
|
|
Contact is Darius with Andersen Construction ###-#### he is concerned if a F/S damper may be required between the Comm Rm ; Linen Holding. Phone #: ###-#### Inspection requested via web by Dan Flaherty- need to submit drawing for approval to city to add fire damper in supply duct to be installed in wall between linen holding room and comm room- met with GC onsite and went over
|