Final | 10/31/2019 | 10/31/2019 | 10/31/2019 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Konrad Swartz- final ok- locking caps installed on a/c
|
Conference | 10/2/2019 | 10/3/2019 | 10/3/2019 | P | PASS |
Brian Scoles
|
|
|
Duct Blast 12pm Phone #: ###-#### Inspection requested via web by Konrad Swartz- duct blast test pass
|
Conference | 10/1/2019 | 10/2/2019 | 10/2/2019 | A | CANC |
Brian Scoles
|
|
|
8:30 Duct Blast Phone #: ###-#### >> Inspection requested via web by Konrad Swartz Inspection cancelled from web by: Konrad Swartz
|
Rough-in | 8/21/2019 | 8/21/2019 | 8/21/2019 | P | PASS |
Brian Scoles
|
|
|
Inspection requested via web by Konrad Swartz- R/I ok- no equipment set will check on final
|
Rough-in | 8/19/2019 | 8/19/2019 | 8/19/2019 | P | PART |
Brian Scoles
|
|
|
Inspection requested via web by Konrad Swartz- seal on duct both floors ok- ok to insulate duct in attic- recall in r/i inspection when complete and insulation in attic is installed
|
Conference | 8/5/2019 | 8/6/2019 | 8/6/2019 | P | DONE |
Brian Scoles
|
|
|
We are needing A seal inspection and was wanting you to do one before we move on to the rest to make sure everything is done Completely and accurate -Please Call Wade ###-#### Inspection requested via web by Konrad Swartz- see notes on 11237 permit-
|
Conference | 8/5/2019 | 8/6/2019 | 8/5/2019 | A | CANC |
Brian Scoles
|
|
|
We are needing A seal inspection and was wanting you to do one before we move on to the rest to make sure everything is done Completely and accurate -Please Call Wade ###-#### Phone #: ###-#### >> Inspection requested via web by Konrad Swartz Inspection cancelled from web by: Konrad Swartz
|