Final | 10/4/2019 | 10/9/2019 | 10/9/2019 | A | PASS |
Jack Reynolds
|
|
|
This is a Flue Pressure and Final Inspect. Please meet our installer at home at 9:00 AM . Contact for Right Now is Mary ###-####
Phone #: ###-#### Inspection requested via web by Mary LaFayette 2 5lb flue pressure tests ok 2 - furnace only co ok
|
Final | 9/26/2019 | 10/2/2019 | 10/2/2019 | A | FAIL |
Jack Reynolds
|
|
|
This is a Flue Pressure and Final Inspect. Please meet our installer at home at 10 AM. Contact for Right Now is Mary ###-####
Phone #: ###-#### Inspection requested via web by Mary LaFayette - tanless water heater and furnace on left side 5lb flue pressure test fail - furnace on right side 5lb flue pressure test ok - gas line needs test ports before regs - need to installed high wall combustion air grille low wall combustion air ok
|
Pressure Test | 8/22/2019 | 8/23/2019 | 8/23/2019 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette - 60lb gas pressure test ok - tagged meter location
|