Conference | 6/3/2020 | 6/3/2020 | 6/3/2020 | P | DONE |
Jack Reynolds
|
|
|
screened // Jeffrey Phone #: ###-####
|
Mec-Aging Inspection | 6/2/2020 | 6/2/2020 | 6/2/2020 | | PASS |
Jack Reynolds
|
|
|
Talked with owner about mechanical permit. He is working on getting a gas line installed and had questions about bonding CSST. He will be working on scheduling a conference soon.
|
Mec-Aging Inspection | 3/3/2020 | 3/3/2020 | 3/3/2020 | | PASS |
Jack Reynolds
|
|
|
WIP
|
Rough-in | 11/26/2019 | 11/27/2019 | 11/27/2019 | A | PASS |
Brian Scoles
|
|
|
Please call when on your way to house. Phone #: ###-#### Inspection requested via web by JEFFREY DAVIS- R/I ok on range duct R/A duct bath fan and fryer duct- homeowner will be installing gas thru crawl at later date nothing in walls stub up for range and future furnace
|
Rough-in | 11/21/2019 | 11/22/2019 | 11/22/2019 | P | CANC |
Brian Scoles
|
|
|
Inspection of return air plenum work. Would like to schedule after 3:30 if possible, please call when on the way to the house. Phone #: ###-#### Inspection requested via web by JEFFREY DAVIS- should have been conference on R/A
|
Conference | 11/22/2019 | 11/22/2019 | 11/22/2019 | P | DONE |
Brian Scoles
|
|
|
Inspection of return air plenum work. Would like to schedule after 3:30 if possible, please call when on the way to the house. Phone #: ###-#### Inspection requested via web by JEFFREY DAVIS- discussed R/A duct above furnace- looks undersized homeowner will find alternative routing and check cfm quantities
|
Conference | 8/16/2019 | 8/19/2019 | 8/19/2019 | P | CANC |
Jack Reynolds
|
|
|
Dryer vent is around back of house exposed in new construction. Walk around west end of the house and the work is in the middle Phone #: ###-#### Inspection requested via web by JEFFREY DAVIS - dryer vent ok
|
Rough-in | 8/19/2019 | 8/19/2019 | 8/19/2019 | P | PART |
Jack Reynolds
|
|
|
Dryer vent is around back of house exposed in new construction. Walk around west end of the house and the work is in the middle Phone #: ###-#### Inspection requested via web by JEFFREY DAVIS - dryer vent R/I ok
|
Rough-in | 8/16/2019 | 8/16/2019 | 8/16/2019 | A | NH |
Jack Reynolds
|
|
|
I have my dryer vent roughed in and would like to proceed with installing the floor so I thought it would be a good time to look at that part of the job. If there are any issues please call me at 208.941.3408 Phone #: ###-#### Inspection requested via web by JEFFREY DAVIS - no access to home left notice on front door
|