Final | 11/4/2019 | 11/4/2019 | 11/4/2019 | P | PASS |
Brian Scoles
|
|
|
Joe Phone #: ###-####- final ok- locking caps installed
|
Rough-in | 9/5/2019 | 9/5/2019 | 9/5/2019 | P | PASS |
Brian Scoles
|
|
|
Joe Phone #: ###-####- R/I ok
|
Rough-in | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | FAIL |
Brian Scoles
|
|
|
Joe Phone #: ###-#### 1- dryer vent outside wall- need to remove horzontal framing and reroute inside of wall 2- exhaust 1st floor needs framing opened up where enters attic in garage duct pinched
left correction notice front window
|
Rough-in | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | NR |
Brian Scoles
|
|
|
add p test Phone #: ###-#### Inspection requested via web by Joe Taylor-
|
Pressure Test | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | PASS |
Brian Scoles
|
|
|
add rough in Phone #: ###-#### Inspection requested via web by Joe Taylor- 20lb gas pass-- 5lb flue pass
|