Final | 1/10/2020 | 1/10/2020 | 1/10/2020 | A | PASS |
Jack Reynolds
|
|
|
Homeowner should be home in the A.M. Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING - final ok
|
Rough-in | 9/17/2019 | 9/18/2019 | 9/18/2019 | A | PASS |
Jack Reynolds
|
|
|
PLEASE CALL CONTRACTOR NATE WHEN EN ROUTE. Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING - R/I ok
|
Pressure Test | 9/18/2019 | 9/18/2019 | 9/18/2019 | A | PASS |
Jack Reynolds
|
|
|
PLEASE CALL CONTRACTOR NATE WHEN EN ROUTE. Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING -20lb gas pressure test ok
|
Final | 9/11/2019 | 9/16/2019 | 9/16/2019 | P | FAIL |
Chad Schwendiman
|
|
|
PLEASE CALL CONTRACTOR NATE WHEN EN ROUTE. WILL NEED GAS PRESSURE TEST FOR NEW LINES. Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING - This should have been scheduled as a rough in and pressure test. Gas pressure test fail, Need to remove strapping on csst in wall cavity, Need framing around dryer duct, need to support dryer duct, need to seal 90 to dryer duct.
|