Final | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | PASS |
Brian Scoles
|
|
|
final Phone #: ###-#### Inspection requested via web by Brandon Sorensen- final ok- card signed
|
Rough-in | 10/28/2019 | 10/28/2019 | 10/28/2019 | P | PASS |
Brian Scoles
|
|
|
Cover Phone #: ###-#### Inspection requested via web by Brandon Sorensen- R/I ok- will look at remaining exposed duct at final- need air balance at final- ok for ceiling tiles
|
Rough-in | 10/16/2019 | 10/17/2019 | 10/17/2019 | A | PART |
Brian Scoles
|
|
|
Grease duct inspection Phone #: ###-#### Inspection requested via web by Brandon Sorensen- grease duct and oven clearances and install ok
|
Rough-in | 10/1/2019 | 10/2/2019 | 10/2/2019 | A | PART |
Brian Scoles
|
|
|
cover inspection Phone #: ###-#### Inspection requested via web by Brandon Sorensen- ok to cover hard lids bathrooms only
|
Rough-in | 9/23/2019 | 9/24/2019 | 9/24/2019 | A | PART |
Brian Scoles
|
|
|
cover inspection - call luke Phone #: ###-#### Inspection requested via web by Brandon Sorensen- seal on ducts above 2 bsthrooms ok- ok to insulate- recall in when insulated before sheetrock- initialed approved prints
|