Final | 5/11/2020 | 5/11/2020 | 5/11/2020 | P | PASS |
Ben Livingston
|
|
|
|
Final | 5/1/2020 | 5/4/2020 | 5/4/2020 | P | PART |
Ben Livingston
|
|
|
Contact person is Shawn Hicks, Phone Number: ###-#### Phone #: ###-#### Inspection requested via web by RM Mechanical - equipment needs tobe under class 1 hoods by 6" min.
|
Rough-in | 3/20/2020 | 3/23/2020 | 3/23/2020 | P | PASS |
Ben Livingston
|
|
|
Rough-in for cover Music Rm, Cafeteria and Dry Storage Area C
3/23/20,PM Shawn Hicks ###-#### Phone #: ###-#### Inspection requested via web by RM Mechanical - Music Rm, Cafeteria and Dry Storage Area C
above grid ok-
|
Rough-in | 3/3/2020 | 3/4/2020 | 3/4/2020 | A | PASS |
Brian Scoles
|
|
|
Rough-in for cover, 2nd layer grease duct, dishwasher hood, Admin Area B1 Phone #: ###-#### Inspection requested via web by RM Mechanical- 2nd layer firewrap ok from hoods thru curb- MAU insulation all drops in kitchen and duct work ok- kitchen diffusers, flex and insulation ok- missing insulation in storage room supply duct above hard lid- dishwasher exhaust duct and seal ok
|
Rough-in | 2/26/2020 | 2/27/2020 | 2/27/2020 | A | PASS |
Ben Livingston
|
|
|
rough-in, MAU in kitchen Shawn Hicks ###-#### Phone #: ###-#### Inspection requested via web by RM Mechanical - mau duct seal okay -
|
Rough-in | 2/21/2020 | 2/21/2020 | 2/21/2020 | P | PASS |
Ben Livingston
|
|
|
Grease Duct 1st layer fire wrap inspection
Pierce Park Elem. D19-039
2/21/20 PM
Shawn Hicks ###-#### Phone #: ###-#### Inspection requested via web by RM Mechanical - 1st layer fire wrap okay -
|
Rough-in | 2/19/2020 | 2/20/2020 | 2/20/2020 | P | PASS |
Ben Livingston
|
|
|
Rough-in Inspection: Cafeteria Grease duct light inspection, Area C hard lids, Rm. 276 for cover, Area B1 ; B2 classrooms for cover Shawn Hicks ###-####
Aaron Roberts ###-#### Phone #: ###-#### Inspection requested via web by RM Mechanical - light test on reconnect to hood - - area c hard lids - - 1st and 2nd floor class rooms above grid okay -
|
Rough-in | 2/7/2020 | 2/10/2020 | 2/10/2020 | P | PASS |
Ben Livingston
|
|
|
Rough-in inspection, Area B, 2nd floor hard ceilings
Shawn Hicks is site contact ###-#### Aaron Roberts ###-#### Phone #: ###-#### Inspection requested via web by RM Mechanical - 2nd floor B above hard lids okay -
|
Rough-in | 1/22/2020 | 1/23/2020 | 1/23/2020 | A | PART |
Ben Livingston
|
|
|
Area B1 Hardlid inspection site contact is Shawn Hicks ###-#### or Aaron Roberts ###-#### Phone #: ###-#### Inspection requested via web by RM Mechanical -above hard lids in Area 1B okay - - fire wrap on greese duct needs to extent above roof line in curb -
|
Rough-in | 1/16/2020 | 1/17/2020 | 1/17/2020 | P | PASS |
Ben Livingston
|
|
|
Rough Overhead tile inspection on Area A Phone #: ###-#### Inspection requested via web by RM Mechanical - area A 1st and 2nd floor above grid okay -
|
Rough-in | 1/13/2020 | 1/14/2020 | 1/14/2020 | P | PASS |
Ben Livingston
|
|
|
1st Layer Grease Duct ###-#### Phone #: ###-#### Inspection requested via web by RM Mechanical - first layer fire wrap okay-
|
Rough-in | 1/6/2020 | 1/7/2020 | 1/7/2020 | A | PASS |
Ben Livingston
|
|
|
Mechanical Rough-in inspection for cover, hard lid Area A2 Site Contacts are Aaron Roberts ###-#### and Shawn Hicks ###-#### Phone #: ###-#### Inspection requested via web by RM Mechanical - area A2 hard lids okay -
|
Rough-in | 12/18/2019 | 12/20/2019 | 12/20/2019 | A | PASS |
Ben Livingston
|
|
|
Rough-in inspection, grease duct light test Phone #: ###-#### Inspection requested via web by RM Mechanical - grease duct light test from roof to wye okay - - area A hard lids and electric heater -
|
Rough-in | 11/8/2019 | 11/12/2019 | 11/12/2019 | A | PASS |
Ben Livingston
|
|
|
D19-013 Rough-in inspection, Area A ; B, 2nd Floor Aaron Roberts, ###-#### Phone #: ###-#### Inspection requested via web by RM Mechanical - 2nd floor area A,B duct seal -
|
Rough-in | 10/4/2019 | 10/7/2019 | 10/7/2019 | P | PASS |
Ben Livingston
|
|
|
rough in pm : Aaron Roberts, ###-#### Phone #: ###-#### Inspection requested via web by RM Mechanical - duct seal area B -
|
Rough-in | 9/24/2019 | 9/25/2019 | 9/25/2019 | A | PASS |
Ben Livingston
|
|
|
Mechanical Rough-in inspection (Duct seal) Aaron Roberts ###-#### Phone #: ###-#### Inspection requested via web by RM Mechanical - duct seal area A -
|