Rough-in | 9/30/2019 | 10/1/2019 | 10/1/2019 | A | PASS |
Brian Scoles
|
|
|
PHYLLIS ###-#### Phone #: ###-#### Inspection requested via web by Mike Almanza- R/I ok
|
Final | 10/1/2019 | 10/1/2019 | 10/1/2019 | A | PASS |
Brian Scoles
|
|
|
PHYLLIS ###-#### Phone #: ###-#### Inspection requested via web by Mike Almanza- fireplace final ok
|
Pressure Test | 9/30/2019 | 10/1/2019 | 10/1/2019 | A | PASS |
Brian Scoles
|
|
|
PHYLLIS ###-#### Phone #: ###-#### Inspection requested via web by Mike Almanza- 20lb gas pass- need to firecaulk gas penetration inside garage at furnace location thru floor
|