Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberMEC19-04363
StatusFinaled
Name AIR HEATING AND COOLING
Site Address 8836 N DUNCAN LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Complete HVAC Installation: MINISPLIT HEATING UNITS
RADIANT FLOOR HEATING USING BOILER
A/C
ERV
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final3/6/20203/9/20203/9/2020PPASS
DetailsBen Livingston
Phone #: ###-#### Inspection requested via web by Kristy Newkirk
Final3/5/20203/6/20203/6/2020PFAIL
DetailsBen Livingston
Phone #: ###-#### Inspection requested via web by Kristy Newkirk
- lineset needs uv protection, condencer needs locking caps
Rough-in12/31/20191/2/20201/2/2020APASS
DetailsBen Livingston
Phone #: ###-#### Inspection requested via web by Kristy Newkirk
-5lbx2-
-roughn in okay-
Rough-in12/30/201912/31/201912/31/2019AFAIL
DetailsBen Livingston
Please call John Eastman when heading to site @ ###-#### Phone #: ###-#### Inspection requested via web by Kristy Newkirk
- dryer vent needs nailplate -
- need flue pressure tests -
Rough-in12/27/201912/30/201912/30/2019ACANC
DetailsBen Livingston
PLEASE CALL JOHN EASTMAN- ###-####. REVISED MANUAL J WILL BE @ SITE IN HVAC CLOSET Phone #: ###-#### >> Inspection requested via web by Kristy Newkirk
Rough-in12/11/201912/12/201912/12/2019AFAIL
DetailsBen Livingston
Could you call John Eastman at ###-####? There have been some changes from the Manual J plan and we are hoping to get an ok to insulate while we are getting the manual J updated. Phone #: ###-#### Inspection requested via web by Kristy Newkirk
- need to have the updated approved manual j on site for inspection -
- need 10mill tape at gas pipe penetration out of the building -
- dryer vent needs nailplate -
- gas flex needs approved stricker plates at double plate by mechanical room -
- need to witness flue pressure test -
Pressure Test12/12/201912/12/201912/12/2019PPASS
DetailsBen Livingston
Could you call John Eastman at ###-####? There have been some changes from the Manual J plan and we are hoping to get an ok to insulate while we are getting the manual J updated. Phone #: ###-#### Inspection requested via web by Kristy Newkirk
- 20lb okay -
Pressure Test10/22/201910/23/201910/23/2019PPASS
DetailsBen Livingston
pressure test for radiant floor tubing Phone #: ###-#### Inspection requested via web by John Eastman
- 100lb -