Final | 1/2/2020 | 1/3/2020 | 1/3/2020 | P | PASS |
Brian Scoles
|
|
|
AC: 2018 Phone #: ###-#### Inspection requested via web by Gary Reeves- final ok
|
Rough-in | 10/15/2019 | 10/15/2019 | 10/15/2019 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- R/I ok- correction made
|
Pressure Test | 10/15/2019 | 10/15/2019 | 10/15/2019 | P | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- already passed
|
Rough-in | 10/10/2019 | 10/11/2019 | 10/11/2019 | P | FAIL |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves Correction notice posted on furnace. Talked to mechanical contractor about corrections.
|
Pressure Test | 10/10/2019 | 10/11/2019 | 10/11/2019 | P | PASS |
Troy James
|
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves 20# gas, 5# flue
|