Mec-Aging Inspection | 8/7/2020 | 8/7/2020 | 8/7/2020 | | PASS |
Jack Reynolds
|
|
|
Due to COVID-19 the City of Boise has suspended inspections inside occupied dwellings until further notice.
|
Mec-Aging Inspection | 5/8/2020 | 5/8/2020 | 5/8/2020 | | DONE |
Jack Reynolds
|
|
|
Called and talked with Fireplace Wholesale about their mechanical aging permit. Contractor has decided to hold off on scheduling inspection until after 5-15-20 when inspections of occuiped dwellings could be lifted. This date could be extended.
|
Rough-in | 10/15/2019 | 10/15/2019 | 10/15/2019 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Preece - fireplace R/I ok
|
Pressure Test | 10/15/2019 | 10/15/2019 | 10/15/2019 | P | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Preece - 20lb gas pressure test ok
|
Pressure Test | 10/14/2019 | 10/14/2019 | 10/14/2019 | P | CANC |
Jack Reynolds
|
|
|
Ed will have the gas line under pressure prior to your arrival. Hopefully he will be to the point where the fireplace is installed as well. If so, rough in that aspect also.
thanks Phone #: ###-#### Inspection requested via web by Brian Preece - not ready
|