Final | 12/30/2019 | 12/31/2019 | 12/31/2019 | A | PASS |
Brian Scoles
|
|
|
Final Phone #: ###-#### Inspection requested via web by Brandon Sorensen- final ok- no card onsite to sign- GC not onsite
|
Card not on site to sign | 12/31/2019 | 12/31/2019 | 12/31/2019 | A | PASS |
Brian Scoles
|
|
|
Final Phone #: ###-#### Inspection requested via web by Brandon Sorensen- card not onsite- GC not onsite
|
Final | 12/24/2019 | 12/26/2019 | 12/26/2019 | A | FAIL |
Brian Scoles
|
|
|
Final Phone #: ###-#### Inspection requested via web by Brandon Sorensen- b vent on tube heater needs 1" clearance to combustilbles thru roof, roofing membrane needs removed and pipe extend up 12" above roof and install storm collar- boiler exhaust flue need secured to hangers and one installed on wall for intake- went over onsite with general contractor- temp occupancy ok
|
Rough-in | 12/23/2019 | 12/23/2019 | 12/23/2019 | P | PASS |
Brian Scoles
|
|
|
insulation and flex and registers ok- ok for ceiling tiles- tube heater penetration on roof needs 1" clearance to b vent on roof by final- right now is roofed onto b vent-
|
Rough-in | 11/26/2019 | 11/27/2019 | 11/27/2019 | A | PART |
Brian Scoles
|
|
|
cover inspection Phone #: ###-#### Inspection requested via web by Brandon Sorensen- registers flex and insulation ok on ducting installed- still need to see square to rounds insulated completely- will send pic then ok for cover of ceiling
|
Rough-in | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | PASS |
Brian Scoles
|
|
|
cover Phone #: ###-#### Inspection requested via web by Brandon Sorensen- insulation on duct installed ok- need to finish insulation on square to round fittings will look at that on grid inspection- will need ladder to access above hard lid in bathroom sheetrock installed already with out approval- called contractor listed and talked to him about this
|
Rough-in | 10/14/2019 | 10/15/2019 | 10/15/2019 | A | PART |
Brian Scoles
|
|
|
sealer inspection Phone #: ###-#### Inspection requested via web by Brandon Sorensen- approved prints onsite- seal on duct in office area ok- ok to insulate- call in another R/I inspection when unit heaters and exhaust duct completed
|