Final | 11/4/2019 | 11/5/2019 | 11/5/2019 | A | PASS |
Brian Scoles
|
|
|
Please schedule 1st thing in the morning. Call me at ###-#### to confirm i''m at job site to provide access. Phone #: ###-#### Inspection requested via web by terry Warden- furnae a/c coil duct work bath exhausts co locking caps installed
|
Final | 11/4/2019 | 11/4/2019 | 11/4/2019 | P | NR |
Brian Scoles
|
|
|
Please call me at ###-#### to insure access. Phone #: ###-#### Inspection requested via web by terry Warden- need 6" clearance from pvc to water heater flue and water flue supported with grade- need to finish all arma flex-
|
Rough-in | 10/15/2019 | 10/15/2019 | 10/15/2019 | P | PASS |
Brian Scoles
|
|
|
Call me at ###-#### to provide access since no one is home at this time. Phone #: ###-#### Inspection requested via web by terry Warden- ducts in attic ok- ok for insulation
|