Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberMEC19-04673
StatusFinaled
Name CARTER COMFORT SYSTEMS LLC
Site Address 1708 S OWYHEE ST
Project Name 
Customer Number25743
ePlanReviewNo
Description
Alteration or Repair: replace existing oil furnace with new natural gas furnace including gas pipe.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final2/12/20202/13/20202/13/2020APASS
DetailsJack Reynolds
Vent Pressure Test is arranged w/Inspector for +/-9AM, installer is Rory Bell ###-#### (he''ll be there to set up @8AM). Job complete, ready to final after VPT passes. Phone #: ###-#### Inspection requested via web by Carlene Badillo
- final and co ok
Pressure Test2/12/20202/13/20202/13/2020APASS
DetailsJack Reynolds
Vent Pressure Test is arranged w/Inspector for +/-9AM, installer is Rory Bell ###-#### (he''ll be there to set up @8AM). Job complete, ready to final after VPT passes. Phone #: ###-#### Inspection requested via web by Carlene Badillo
- 5lb flue pressure test ok
Pressure Test2/12/20202/14/20202/12/2020PCANC
DetailsJack Reynolds
Jenese Phone #: ###-#### Inspection cancelled from web by: Carlene Badillo
Final11/21/201911/21/201911/21/2019PFAIL
DetailsJack Reynolds
tenant =Jenese ###-#### -thank you! ~Carlene. Phone #: ###-#### Inspection requested via web by Jesica Currie
- need to witness 5lb flue pressure test
Final11/19/201911/21/201911/21/2019ACANC
DetailsJack Reynolds
the tenant said IF you prefer afternoon please give her a heads-up and she''ll be there. tenant =Jenese ###-#### -thank you! ~Carlene. Phone #: ###-#### >> Inspection requested via web by Carlene Badillo Inspection cancelled from web by: Jesica Currie
Pressure Test10/21/201910/21/201910/21/2019PPASS
DetailsJack Reynolds
GPT reinspection, so we can get meter set today Phone #: ###-#### Inspection requested via web by Carlene Badillo
- 20lb gas pressure test ok
- tagged meter location
Pressure Test10/18/201910/21/201910/21/2019AFAIL
DetailsJack Reynolds
we''ll be set up for GPT on Monday morning, coordinating with IntGas for a new meter to be set. If you have questions, please contact the installer: Barry Griffin ###-####. Thank you! :) ~Carlene Phone #: ###-#### Inspection requested via web by Carlene Dickens
- 20lb gas pressure test ok
- one support on the outside needs secured or tightened up
- protective wrap at penetrations cant be seen outside
- need one more support inside when gas pipe turns down to furnace
- will tag gas pipe when corrections have been made