Final | 11/7/2019 | 11/7/2019 | 11/7/2019 | A | PASS |
Brian Scoles
|
|
|
electrical permit issued and passed- final ok
|
Final | 10/31/2019 | 11/4/2019 | 11/4/2019 | A | FAIL |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Denise Colin- furnace a/c coil co locking caps ok- need electrical permit issued for electric to gas conversion and shutoff switch install at furnace
|
Pressure Test | 10/31/2019 | 11/4/2019 | 11/4/2019 | A | PASS |
Brian Scoles
|
|
|
flue pressure test Phone #: ###-#### Inspection requested via web by Denise Colin- 5lb flue pass
|
Pressure Test | 10/21/2019 | 10/21/2019 | 10/21/2019 | P | PASS |
Brian Scoles
|
|
|
gas line pressure test Phone #: ###-#### Inspection requested via web by Denise Colin- 20lb gas pass- tagged meter location- no meter or gas line ran to house by in termountain gas- need to witness flue test at final
|