Final | 12/4/2019 | 12/4/2019 | 12/4/2019 | P | PASS |
Brian Scoles
|
|
|
NACHO ###-#### Phone #: ###-#### Inspection requested via web by Mike Almanza- fireplace final ok
|
Rough-in | 10/29/2019 | 10/29/2019 | 10/29/2019 | P | PASS |
Brian Scoles
|
|
|
NACHO ###-#### Phone #: ###-#### Inspection requested via web by Mike Almanza- R/I ok
|
Rough-in | 10/25/2019 | 10/28/2019 | 10/28/2019 | A | NR |
Brian Scoles
|
|
|
NACHO ###-#### CORRECTIONS HAVE BEEN MADE Phone #: ###-#### Inspection requested via web by Mike Almanza- still installing- need clarification for general contractor on draftstop and enclosing
|
Rough-in | 10/18/2019 | 10/25/2019 | 10/25/2019 | A | FAIL |
Brian Scoles
|
|
|
SUP.: NACHO ###-#### Phone #: ###-#### Inspection requested via web by Mike Almanza- need minimum 2" clearance at roof around flue pipe- need all framing complete around fireplace- need draft stop installed- recall in when ready
|