Final | 1/30/2020 | 1/31/2020 | 1/31/2020 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Sheldon Lebow - unit 202, 207, 304 fireplace final ok - will, sign occ card once all mech permits are finaled
|
Final | 1/29/2020 | 1/29/2020 | 1/29/2020 | P | PART |
Jack Reynolds
|
|
|
LOBBY FIREPLACE, 30,303,304,208,202,206,207,201,102,107,101 Phone #: ###-#### Inspection requested via web by Sheldon Lebow Area B not ready 101, 102, 107, lobby 201, 206, 301, 303 fireplace ok 202, 207, 304 not ready
|
Final | 1/22/2020 | 1/22/2020 | 1/22/2020 | A | PART |
Jack Reynolds
|
|
|
Temp final ok on area A units only 103,104,105,106, lobby 203, 204, 205, 302 and parking garage - Fireplaces in Area B still need to have final inspection done
|
Final | 12/13/2019 | 12/16/2019 | 12/16/2019 | A | CANC |
Jack Reynolds
|
|
|
104 AND 105 Inspection requested via web by Sheldon Lebow - Area A fireplaces should have been on other permit. I adjusted and schedule the right permit for Area A fireplaces. This permit is for Area B
|
Final | 12/11/2019 | 12/11/2019 | 12/11/2019 | P | FAIL |
Jack Reynolds
|
|
|
ready for final in units S302,K203,P204,V205,Q106,P104,P105,K103 Phone #: ###-#### Inspection requested via web by Sheldon Lebow - units 104 and 105 need access to gas valves
|
Rough-in | 11/12/2019 | 11/12/2019 | 11/12/2019 | A | PASS |
Jack Reynolds
|
|
|
unit 101 fireplace gas valve ok
|
Rough-in | 11/6/2019 | 11/7/2019 | 11/7/2019 | A | PART |
Jack Reynolds
|
|
|
1ST AND 3RD FLOOR FIREPLACES Inspection requested via web by Sheldon Lebow - 3rd floor area B fireplaces ok - 1st floor area B all fireplaces but 101 ok. Unit 101 needs gas valve moved closer to opening. Talked with gas piping contractor about issue
|
Rough-in | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | PART |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Sheldon Lebow - 1st floor fireplaces not ready -2nd floor fireplaces 4 units fireplaces ok - 3rd floor fireplaces not ready
|