Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberMEC19-04767
StatusFinaled
Name AMERICAN CHILLER
Site Address 222 S BROADWAY AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
Alteration: Remodel existing space pool space that is turning into a fitness room. demo existing unit and replacing new unit. duct work may or may not be replaced
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final12/9/201912/9/201912/9/2019PPASS
DetailsBen Livingston
final: call 30 mins before arrival. ###-#### (adrian) Phone #: ###-#### Inspection requested via web by adrian manzo
Rough-in11/14/201911/15/201911/15/2019PPASS
DetailsBen Livingston
Rough-in for cover. Dusty is on-site contact for ACS ###-#### Phone #: ###-#### Inspection requested via web by adrian manzo
Conference11/5/201911/6/201911/6/2019APASS
DetailsBen Livingston
Look over ductwork that will be in the soffit. Question is: Do we need to insulate the ductwork if it is in the soffit? The original ductwork wasn’t insulated. This job is to replacement of the existing ductwork to new. No new changes. A phone call is ok with me. Phone #: ###-#### Inspection requested via web by adrian manzo
- duct within building envolop doesnt require insulation -