Final | 4/22/2020 | 4/23/2020 | 4/23/2020 | A | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by Brent Lacy- gas piping final ok
|
Pressure Test | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | PASS |
Brian Scoles
|
|
|
Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy- 20lb gas pass whole system- tagged meter location- need to sleevegas line thru stucco at meter location fefore rock installed on perimeter- 2 interior gas lines in walls ok for cover
|
Pressure Test | 1/3/2020 | 1/6/2020 | 1/6/2020 | P | PART |
Chad Schwendiman
|
|
|
Partial gas inspection. Onsite Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy - 20lb gas pass for piping in wall from water heater to roof and in wall from meter to the roof. Piping on the roof will be completed later
|