Final | 12/3/2019 | 12/4/2019 | 12/4/2019 | A | PASS |
Chad Schwendiman
|
|
|
Please call ahead for access after 10am, ###-#### or Kevin (QHC) @ Phone #: ###-#### Inspection requested via web by Kevin Pratley
|
Final | 11/27/2019 | 12/2/2019 | 12/2/2019 | A | CANC |
Jack Reynolds
|
|
|
Need re-inspect after corrections. Tech will finish up by 11:30; Please contact resident to notify for access by 1pm ###-#### or Aaron (QHC) @ ###-#### or Kevin (QHC) @ Phone #: ###-#### >> Inspection requested via web by Kevin Pratley Inspection cancelled from web by: Kevin Pratley
|
Final | 11/20/2019 | 11/21/2019 | 11/21/2019 | A | FAIL |
Jack Reynolds
|
|
|
Please Call Ahead, ###-#### to Crystal for access between 10am to 1pm for final; or call Kevin (QHC) @ Phone #: ###-#### Inspection requested via web by Kevin Pratley - line set at indoor coil needs more insulation installed - secondary drain on new coil needs a wet switch - condensate pump needs safety switch wired - need to installed co sensors both upstairs and downstairs - where common vent penetrates masonary chimney needs draft stop installed
|
Final | 11/1/2019 | 11/5/2019 | 11/5/2019 | A | NH |
Brian Scoles
|
|
|
resident requests late AM inspection; contact QHC ofc ###-#### or Kevin (QHC) @ Phone #: ###-#### Inspection requested via web by Kevin Pratley- no one answered doorbell or knock on door- no access
|