Final | 5/6/2020 | 5/6/2020 | 5/6/2020 | P | PASS |
Brian Scoles
|
|
|
Please call Steve at least least 60 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum- final ok- card signed
|
Final | 4/28/2020 | 4/29/2020 | 4/29/2020 | P | PART |
Brian Scoles
|
|
|
Please call Steve at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum- 1st floor insulation missing tape in few areas- 2nd floor 1/2 done on insulation- need to grout in around fire/smoke damper first floor and install angles- rtu 30 needs condensate drain installed- went over all items with Mason onsite- recall in when all areas completed
|
Rough-in | 4/20/2020 | 4/21/2020 | 4/21/2020 | P | PASS |
Brian Scoles
|
|
|
Please call Steve at least 30 min prior to inspection, he is prepared to do video call if required, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum- R/I ok 1st and 2nd floor seal ok- ok for insulation all areas- smoke dampers needs access doors and labels by final- Will need access to RTU 30 at final- fire/smoke damper clearances 1st floor ok- ok for angles
|
Rough-in | 4/1/2020 | 4/2/2020 | 4/2/2020 | P | PART |
Brian Scoles
|
|
|
Level 1, late afternoon, please call Steve at least 1 hr prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum- 1st floor seal on ducts ok- ok to insulate only ducts with X marked on city approved prints- Steve onsite and went over
|
Rough-in | 3/25/2020 | 3/26/2020 | 3/26/2020 | P | PART |
Brian Scoles
|
|
|
Late afternoon, please call Steve at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum- approved prints onsite- 2nd florr duct seal ok- ok to insulate all areas marked with x on prints- few ducts left to install will look at them when do first floor inspection
|
Rough-in | 3/9/2020 | 3/10/2020 | 3/10/2020 | A | CANC |
Brian Scoles
|
|
|
Please call/text Steve at least 30 min prior to inspection, thank you! Phone #: ###-#### Inspection requested via web by Rhonda Marcum- bld permit needs issued before R/I inspection can be done- talked with Steve about this he will check into this- reschedue when bld issued
|