Final | 7/1/2020 | 7/2/2020 | 7/2/2020 | A | PASS |
Jack Reynolds
|
|
|
KEITH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Pressure Test | 6/12/2020 | 6/15/2020 | 6/15/2020 | A | PASS |
Jack Reynolds
|
|
|
JOB CONTACT - KEITH ###-#### NEED GAS TAG Phone #: ###-#### Inspection requested via web by BECCA DUMMER - re tagged gas line
|
Pressure Test | 5/6/2020 | 5/7/2020 | 5/7/2020 | P | PASS |
Jack Reynolds
|
|
|
KEITH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER - 60lb gas test ok
|
Mec-Aging Inspection | 5/4/2020 | 5/4/2020 | 5/4/2020 | P | DONE |
Jack Reynolds
|
|
|
|