Final | 3/23/2020 | 3/23/2020 | 3/23/2020 | A | PASS |
Jack Reynolds
|
|
|
- future work final ok
|
Final | 2/26/2020 | 2/27/2020 | 2/27/2020 | A | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by RaChelle Frisbee - two exhaust fan terminations and one plumbing vent to the south of economizer need to be either 10' away or 3' above econo
|
Rough-in | 11/14/2019 | 11/15/2019 | 11/15/2019 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by RaChelle Frisbee - hard lid R/I ok
|
Rough-in | 11/13/2019 | 11/14/2019 | 11/14/2019 | A | FAIL |
Jack Reynolds
|
|
|
Hard lid cover bathroom Phone #: ###-#### Inspection requested via web by RaChelle Frisbee - mechanical permits still need seperated to each space - flex duct cant penetrate wall and needs to be rigid duct
|
Rough-in | 11/12/2019 | 11/13/2019 | 11/13/2019 | A | FAIL |
Jack Reynolds
|
|
|
Hard lid cover bathroom...Please call Ben with questions ###-#### thank you! Phone #: ###-#### Inspection requested via web by RaChelle Frisbee - each Vanilla TI needs its own mechanical permit grouped with proper buidling permit - exhaust flex duct needs sealed at fan and all seams
|