Final | 1/27/2020 | 1/28/2020 | 1/28/2020 | A | PASS |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Jose Lagunas - final ok
|
Rough-in | 11/22/2019 | 11/22/2019 | 11/22/2019 | P | PASS |
Ben Livingston
|
|
|
Phone #: ###-#### Inspection requested via web by Jose Lagunas - 5lb,rough in -
|
Rough-in | 11/20/2019 | 11/20/2019 | 11/20/2019 | P | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Jose Lagunas - city approved man j onsite - two supply boots for upstairs need insulated below floor where outside the building - 5lb flue pressure test fail - combustion opening size needs to be a min of 100sq" and one high and one low
|
Pressure Test | 11/20/2019 | 11/20/2019 | 11/20/2019 | A | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Jose Lagunas - 5lb flue pressure test fail - 20lb gas pressure test ok - tagged meter location
|