Permit Information
Permit NumberMEC19-05425
StatusIssued
Name HOBSON FABRICATING CORP
Site Address 1100 W IDAHO ST
Project Name 
Customer NumberH9843
ePlanReviewNo
Description
New: Complete HVAC
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Rough-in8/10/20208/10/20208/10/2020PPASS
DetailsBen Livingston
cover in bathrooms on 3rd floor through 9th floor Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
-4th and 5th floor restrooms okay
Rough-in8/6/20208/6/20208/6/2020PPART
DetailsChad Schwendiman
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - Okay to insulate ductwork in 2nd floor shaft. need to remove sheetrock to be able to inspect fire/smoke damper framing. Need manufactures certification for repaired fire blanket on 4th floor
Rough-in7/13/20207/14/20207/14/2020APART
DetailsChad Schwendiman
It be for the shaft duct to be covered on floors 3-9 Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - Okay to build shaft wall on floors 3, 5, 6, 7, 8 & 9. Need to repair or replace fire blanket on outside of the damper sleeve on 4th floor. If repaired need to provide the manufactures instruction for repairing when reinspected.
Rough-in5/22/20205/26/20205/26/2020APASS
DetailsChad Schwendiman
shaft duct inspected for insulation

Phone #: ###-#### Inspection requested via web by Amanda Farnsworth - Duct seal okay on shafts from 2nd floor through the 9th. floor
Rough-in8/13/20208/14/2020 P 
DetailsBen Livingston
3rd & 6th floor bathroom celing cover and 3rd floor-8th floor shaft wall cover

Phone #: ###-#### >> Inspection requested via web by Amanda Farnsworth