Final | 2/10/2020 | 2/11/2020 | 2/11/2020 | A | PASS |
Brian Scoles
|
|
|
FINAL Phone #: ###-#### Inspection requested via web by Brandon Sorensen- final ok- card signed
|
Rough-in | 1/30/2020 | 1/30/2020 | 1/30/2020 | P | PASS |
Brian Scoles
|
|
|
Corrections have been made- ok for ceiling tiles all areas- has air balance been completed??- call in final when ready
|
Rough-in | 1/28/2020 | 1/29/2020 | 1/29/2020 | A | PASS |
Brian Scoles
|
|
|
Cover inspection - call Josh Phone #: ###-#### Inspection requested via web by Brandon Sorensen- center stairwell east side rooms insulation, flex and registers all good excluding skills lab need to cap abandoned exhaust in ceiling, staff work area needs supply duct lengthened and register installed per reflected ceiling print and learning resorce room needs supplies and R/ A ducting capped above ceiling- call in final when ready- has air balance been completed??
|
Rough-in | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | PASS |
Brian Scoles
|
|
|
partial cover Phone #: ###-#### Inspection requested via web by Brandon Sorensen- center stairwell west all rooms ok for ceiling grid except for 4 misc rooms- will look at next week on east half
|
Rough-in | 1/14/2020 | 1/15/2020 | 1/15/2020 | A | PART |
Brian Scoles
|
|
|
sealer inspection Phone #: ###-#### Inspection requested via web by Brandon Sorensen- seal on duct ok per check marks on contractors print ok for insulation- still couple offices to see for seal installing now
|
Rough-in | 1/7/2020 | 1/8/2020 | 1/8/2020 | A | PART |
Brian Scoles
|
|
|
partial seal and rough in Phone #: ###-#### Inspection requested via web by Brandon Sorensen- seal east side on rooms only checked off on prints- west side all good on seal- ok for insulation-
|
Rough-in | 12/27/2019 | 12/30/2019 | 12/30/2019 | A | PART |
Brian Scoles
|
|
|
Duct Seal Inspection Phone #: ###-#### Inspection requested via web by Brandon Sorensen- center stairwell to west seal on all duct ok ok ti insulate excluding 3 rooms and existing RTU to move- call in when ready
|