Final | 1/22/2020 | 1/22/2020 | 1/22/2020 | P | PASS |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by mary bell- final ok co installed
|
Final | 1/16/2020 | 1/22/2020 | 1/22/2020 | A | CANC |
Brian Scoles
|
|
|
Phone #: ###-#### Inspection requested via web by mary bell- will reschedule per phone call
|
Pressure Test | 12/20/2019 | 12/23/2019 | 12/23/2019 | A | PASS |
Brian Scoles
|
|
|
This is a second inspection with the proper gauge installed. Call me with any questions Phone #: ###-#### Inspection requested via web by mary bell- 20lb gas pass tagged meter location- need to seal exterior penetration weather tight by final when furnace by other contractor is installed
|
Pressure Test | 12/18/2019 | 12/19/2019 | 12/19/2019 | P | FAIL |
Brian Scoles
|
|
|
The phone number is for my son in law Joshua and he will meet you at the property Phone #: ###-#### Inspection requested via web by mary bell- 20lb gas test has to have 30lb gauge max- need inert tape on gas piping thru foundation- retest
|