Final | 6/9/2020 | 6/10/2020 | 6/10/2020 | A | PASS |
Jack Reynolds
|
|
|
Joe Phone #: ###-#### - final ok
|
Rough-in | 12/12/2019 | 12/13/2019 | 12/13/2019 | A | PASS |
Jack Reynolds
|
|
|
ADD P TEST Phone #: ###-#### Inspection requested via web by Joe Taylor - Mini Split R/I ok
|
Pressure Test | 12/12/2019 | 12/13/2019 | 12/13/2019 | A | CANC |
Jack Reynolds
|
|
|
With Rough in Phone #: ###-#### Inspection requested via web by Joe Taylor - after talking with Joe no gas line will be on this permit.
|
Rough-in | 12/10/2019 | 12/10/2019 | 12/10/2019 | P | FAIL |
Jack Reynolds
|
|
|
Phone #: ###-#### Inspection requested via web by Joe Taylor -condensate line needs to be 3/4" min and of approved material - only use condensate pump to achieve grade
|